Frequently Asked Question

Yes, the owner comes by and looks at the project and gives a full description of the work tone done and price .
 

We will just need the cars off the driveway the morning of the installation, the rest we take care of . 

Asphalt driveways and Sealcoating need 48 hrs to complete cool & cure . 
 
Potholes are generally caused by water penetrating the surface, weakening the base , and combined with traffic load, causing the pavement to break. 
1.5-2” on overlaying over old pavement 3” over Gravel and on commercial projects depends 3-4” in some cases.
 

Milling is a process on grinding of the top layer of old , damaged asphalt to prepare the surface for a new layer. 

15-25 years depending on overlaying or from the ground up, other things like concrete trucks , simi traffic and maintenance can play a roll. 
 

There’s a wide range on pricing , overlaying driveways or parking lots can range from $2.50 sqft up . Paving over gravel can start @ $3.00 sqft and up , there’s a lot that figures in on pricing , location , prep work , etc 

When resurfacing we go over the existing pavement, replacing is were we remove the driveway and start over.

Yes , that’s overlaying / resurfacing, provided you have a good base to go over .
 

Yes , We offer installation of box drains and Calvert pipe replacement and installation. 

We start in April and stop in November . 
 
Yes , we offer church,  seniors , police , firefighters along with neighbourhood discounts when 2 or more driveways need done in the same area . 
 

Yes , we do gas stations , churches, simi parking , anything commercial or residential we cover . 

Frank is 3rd Generation and is on all job sites , The crew has all between 3-25 yrs experience each .